Can Llopis Romantic Museum Air Conditioning Renovation
Development
Ingenibo Projects has carried out the Executive project for the renovation of the HVAC and Ventilation installation of the historic building with 3 floors and one below ground level, clearly differentiating two areas: the museum area, which requires temperature and humidity control, and the annex area. which requires only temperature control.
Data
- Area: 1,297 m2
- Electrical power: 173 kW
- Central cooling production power: 214 kW
- Cooling load: 203 kW
- Heating load: 104 kW