Turnkey Adaptation of Warehouse 12
Development
Ingenibo Projects has carried out the sanitation and painting work on the pavement of Nave 12, as well as the sectorization of the production area and its subsequent air conditioning.
Data
- Surface: 4,272 m2
- Cooling power: 137.5 kW
- Heating power: 143.3 kW